Getting Here

We can't wait to meet you...

DRIVING DIRECTIONS

Once you arrive at Dease Lake, turn onto Boulder Ave. Drive to the end of Boulder Ave and turn Left onto the Telegraph Creek Road. It is approx. 112 KM to Telegraph Creek; it is a gravel road with up to 20% grades.  It usually takes about 2 hours, but if you stop and take pictures and enjoy the scenery, it can take up to 3 hours. (also weather depending!)

Once you arrive into Telegraph Creek You will cross the Telegraph Creek bridge, drive down a hill into a dip, and drive up the hill-  at the top of the hill there is a junction, stay to the RIGHT, driving straight on the “Glenora Road”. (If you turn left at the top of the hill, that will take you right into the main town of Telegraph Creek, where the post office, store, RCMP detachment and health clinic are located). 

Our location is approximately 4.5 KM from that junction. On the “Glenora Road”- we are the first driveway on the right after the last power pole. There is a tractor with big red rims and our signs; you can’t miss us!  Drive straight, and come check in at the main house.

 

WEATHER:

We usually go by the Dease Lake Weather Forecast, it is not 100% accurate for us, but it gives you a rough idea of what the weather will be like here in Telegraph Creek/surrounding area
.

ROAD CONDITIONS

Be sure to check out Drive BC for road conditions before making the long journey. 

The Drive BC website has webcams located in:
BC/Yukon Border
Good Hope Lake
Dease Lake
Meziadin Junction
Kitwanga

Road Conditions for Highway 37 North(Alaska Highway)
Road Conditions for Highway 51(Dease Lake to Telegraph Creek)